Differences between revisions 4 and 5
Revision 4 as of 2009-05-06 10:04:49
Size: 854
Editor: AlexFinch
Comment:
Revision 5 as of 2009-05-06 10:05:52
Size: 925
Editor: AlexFinch
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
attachment:eveDisp_simple1. attachment:eveDisp_simple1.jpg
attachment:eveDisp_simple2.jpg
Line 19: Line 20:
attachment:testbeameventnocuts.png

Some Event displays from beam running

Two easy events

First of all to get your eye in, the simplest of the simple: a paricle going straight through the centre. The way i have arranged things here has

Left upper panel
View from the side of the DsECal, (as you would see it from the counting room if the shield wasn't there)
Left lower panel
View from above the detector
Right panel
3D display, generally looking from the same side as the Left lower pannel

The beam goes from right to leftBR attachment:eveDisp_simple1.jpg attachment:eveDisp_simple2.jpg

Here is a more complex example using timing cuts

I am looking at event 8 from dsecal_00010114_0000.daq.mid

attachment:testbeameventnocuts.png


["Calibration"]

Calibration/Testbeam/EventDisplays (last edited 2009-07-13 20:19:59 by localhost)